Carpenter to do list

Sheetrock garage-

  • highest priority area- ceiling where garage door opener hardware will be installed.
    area is 22 x 5 feet
  • walls- floor to 8 feet up to cover electrical and meet sign off requirements for the permit.

Wood boxes for steps at front door and tiled steps

  • the county wants these boxes for code purposes until we do brick the driveway
box 1
box 2

Ernest to do these 2 beds-

we need wood.

both retaining walls should be about 24 inches tall. Ernest will measure the length.

this also shows the 2 Mexican palms planted
another Mexican palm and the windmill palm planted here. we need more palm/cactus dirt to plant the remaining canary palm. We also need more palm fertilizer